Back to insights
Citrix & Virtualisation

Citrix UHMC Renewal: Measuring Peak Concurrent Users First

Citrix UHMC is licensed per concurrent user, so the renewal quantity should come from measured peaks, not headcount. Where to read them, and the telemetry and edition rules that go with the licence.

Citrix Universal Hybrid Multi-Cloud is licensed per concurrent user: the number of people connected at the same time, not the number of people in the directory. That suits organisations with shift work or part-time staff, but only if the renewal quantity is based on a measured peak rather than headcount or a number carried forward from an old licence. This guide covers where the peak figure lives, what Citrix expects the License Server to report, and one trap that catches sites renewing in stages.

What a concurrent user licence counts

For Citrix DaaS, Citrix Cloud assigns a concurrent licence when a user launches an app or desktop and releases it when the user logs off or disconnects. The count is of unique devices connected at the same time. Two details from the documentation matter when you read the figures:

  • A user who launches through both the HTML5 client and the locally installed Workspace app can be counted twice.
  • The concurrent sessions report in Director counts differently and does not reflect concurrent licences in use, so it is not the number to renew on.

Citrix also states that it does not block launches when assigned licences exceed purchased licences; the customer is expected to monitor usage. The dashboard, not an outage, is the only signal that you have outgrown the licence.

Reading peak usage in Citrix Cloud

Select Licensing from the Citrix Cloud console menu. For a DaaS concurrent subscription the summary shows the percentage of purchased licences in use, the ratio of assigned to purchased licences, and three peak tiles: the last 24 hours, this calendar month and all time since the subscription started. Each peak carries the date and time it was reached, and a lower count later never reduces a stored peak. The Total on each tile is the number of licences owned at the time of that peak.

Under View Usage Details the License Assignment chart plots total licences against peak licences in use, by month for the current year by default, with drill-down to day and hour. The Active Use chart shows unique users or devices over the last 30 days and by month for the previous year, and usage can be exported to CSV. The page also warns within 90 days of subscription expiry, a sensible point to start the renewal review.

Getting on-premises peaks into the same view

Sites running Citrix Virtual Apps and Desktops on their own Delivery Controllers do not see their usage in Citrix Cloud automatically. Citrix documents how to register a License Server, version 11.15.0.0 or later, so that its usage appears under Licensing > Licensed Deployments: turn on Share usage statistics in the Licensing Manager console, confirm the server can reach the Citrix Cloud addresses (las.cloud.com, cis.citrix.com and the citrixworkspacesapi.net hosts, through a proxy if you use one), and register the server with Citrix Cloud.

The view then shows installed licences per server and peak concurrent licences in use over the last 7 days, this month and all time since registration, with trends, overdraft and a breakdown by Concurrent and User/Device. Servers upload once a day. A server shows as Reporting if it has uploaded in the last 3 days, Not Reporting if its last upload was between 3 and 30 days ago, and is removed after 30 days of silence. Only reporting servers count toward the totals, so a quiet branch server can make the estate look smaller than it is. This registration applies to traditional licence files; sites that have moved to the License Activation Service, covered in our article on the Citrix LAS deadline, activate differently.

The telemetry you must send anyway

Separately from the Citrix Cloud view, Citrix requires licence usage reporting from License Server 11.17.2 build 40000 onward. The Citrix Licensing Telemetry program is marked required and its automatic upload is enabled at install; it sends product IDs, licence types, quantities, user and device data and usage, along with server details such as the hardware ID. The first upload happens about 24 hours after the server starts and then daily. The compliance rule is that the days since the last successful upload must not exceed 90, and Citrix says it may suspend or terminate support for a non-compliant server. The same page asks customers to move to the newest License Server version within six months of its release.

An isolated server is not exempt. Where cis.citrix.com cannot be reached, the documented alternative is to disable the License Management Service and upload the compliance and usage files by hand through Citrix Insight Services, a task that belongs on the same operations list as the patching in our LTSR upgrade planning checklist.

Avoid a mixed-edition site when renewing in stages

UHMC gives Premium edition on concurrent licences. Citrix support article CTX666278 warns that renewing a smaller part of an estate as UHMC while the rest stays on Advanced, Standard or User/Device licences produces a mixed-edition site, which Citrix says is not allowed and can cause product issues; its example is 1,000 Premium licences renewed alongside 4,000 Advanced. The warning applies to sites with customer- or partner-managed Delivery Controllers, not to Citrix Cloud.

Citrix's answer is a compatibility licence issued with each UHMC renewal, covering every Virtual Apps and Desktops edition and type, with no overdraft. You install the edition that matches most of your licences. Ask for it if your estate is moving to UHMC over more than one cycle.

Check what the entitlement includes

Read the product-specific terms rather than the datasheet before renewing. Citrix's current terms list UHMC with a User unit type and these entitlements: NetScaler at 999 software instances with throughput capped at 1,000 Gbps, XenServer at 10,000 CPU socket licences, SecurAccess ZTNA and Endpoint Management limited to the number of UHMC licences purchased, and Experience Insights, UniconOS and deviceTRUST unlimited. Our note on XenServer 9 entitlements covers the hypervisor side. Unit type definitions sit in the Citrix business unit terms, so file the version in force at signature with the contract.

The renewal review is then short: export the all-time and monthly peaks 90 days before expiry, confirm every License Server is registered and reporting, and decide whether the whole estate moves to UHMC. OAS runs that review as part of its Citrix platform service.

Sources

Have your concurrent usage measured and your UHMC renewal sized by the Citrix team at OAS.

Keep exploring

All insights